Water Supply at Keshavnagar under Package-10 of Equal Water Supply Scheme for Newly Merged 34 Villages
The project includes development of approximately 8.24 km of drinking water pipelines ranging from 110 mm to 800 mm in diameter and construction of a 3.5 MLD ESR for Keshavnagar, a newly merged village under Pune Municipal Corporation. DPR for the remaining 5 zones is in the final stage.
Estimated Cost: ₹135.57 Crore
• Zone-2 Work: ₹24.05 Crore (Work in progress)
Status:
• DPR for remaining 5 zones in final stage
Contractor:
M/s V. M. Jawale Construction
Work Order Date:
12/12/2025
PROPOSED DISTRIBUTION KESHAVNAGAR-OZ-2-R3_A1
01_BULK NETWORK KESHAVNAGAR_WITH_IMAGE_R1-1
Project Status