Department
Order
4
Display format
Grid
Gallery
Image
Image
Image
Image
Other Details
This water supply scheme is being implemented for the newly merged villages of Lohgaon and Wagholi under Pune Municipal Corporation. The project includes the development of approximately 432 km of drinking water pipeline network with varying diameters ranging from 900 mm to 100 mm.
Additionally, the project involves the construction of Elevated Service Reservoirs (ESR) and Ground Service Reservoirs (GSR) of different capacities. In Lohgaon, a total of 7 water tanks, 1 Master Balancing Reservoir (MBR), and 1 sump well are being constructed, while in Wagholi, a total of 6 water tanks are being developed.
Estimated Cost:
₹ 230 Crore
Tender Details & Contractors:
- Pipeline Development – M/s Arihant Construction (Work Order Date: 19/01/2024)
- Construction of Water Tanks – M/s Krishiraj Infrastructure (Work Order Date: 14/02/2024)
Project Status
Ongoing