Pune 24X7 Water Supply

Summary

<h3><strong>Old Limits of the Integrated Water Supply Project:</strong>&nbsp;</h3>
<ul>
<li>Pune City has been divided into a total of 5 sections based on the capacity of its water treatment centres.<br>(Package-1: Parvati, Package-2: Bhama Askhed, Jagtik Line, Package-3: Warje, Package-4: Lashkar and Package-5: Vadgaon)</li>
<li>Each section includes the construction of water storage tanks, the main pressure pipelines that supply water to these tanks (Packages 6 &amp; 7), works on the water distribution mains, pumping stations, civic amenity centres, etc.</li>
<li>The project comprises a total of 7 civic amenity centres.</li>
<li>AMR meters will be installed on water connections throughout the city under the project.</li>
<li>The completed works under the project will be transferred for maintenance and repairs to the contractors: M/s. L &amp; T Construction (Packages 1, 2, 3, 5) and M/s. Jain Irrigation System (Package-4).</li>
</ul>
<h3><strong>Water Supply Project – Newly Included 34 Villages + Yevalewadi:</strong></h3>
<h3><strong>Details of the Water Supply Scheme for the Included Villages</strong></h3>
<ul>
<li>For the villages of Bavdhan Bu, Mhalunge &amp; Sus, and Lohagaon &amp; Wagholi, 5, 6, and 13 tanks are proposed respectively; the tender process for the pipeline works in these villages has been completed and the on-site work is underway.</li>
<li>For the villages of Narhe, Ambegaon Bu., Ambegaon Khu., Kolewadi, Jambhulwadi, Dhayri, Khadakwasla, Nandoshi, Nanded, Kirkatwadi, and Sanas nagar, the DPR work has been completed.</li>
<li>The preparation of the DPR is in progress for the villages of Bhilarewadi, Gadewadi, Gujer Nimbalkarwadi, Yevalewadi, Shevalwadi, Hadapsar Sadesathrani, Keshavnagar Mundhwa, Undri, Pisoli, Vadachiwadi, Holkarwadi, Autade Handewadi, Kondhve Dhavde, Kopare, Shivane, Uttam Nagar, Manjari Bu. Furusungi, and Uruli Devachi.</li>
</ul>
<h3><strong>Contact Details</strong></h3>
<div class="table-responsive">
<table class="text-start">
<thead>
<tr>
<th>Position</th>
<th>Name</th>
<th>Package</th>
</tr>
</thead>
<tbody>
<tr>
<td>Chief Engineer</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>Executive Engineer</td>
<td>Shri. Sanjay Mohite</td>
<td>Package-1 &amp; 4</td>
</tr>
<tr>
<td>Executive Engineer</td>
<td>Shri. Eknath Gadekar</td>
<td>Package-2</td>
</tr>
<tr>
<td>Executive Engineer</td>
<td>Smt. Shobha Gholap</td>
<td>Package-3</td>
</tr>
<tr>
<td>Executive Engineer</td>
<td>Shri. Hemant More</td>
<td>Package-5</td>
</tr>
<tr>
<td>Executive Engineer</td>
<td>Shri. Vinod Kshirsagar</td>
<td>Package- 6, 7, Tank Works and Newly Included Villages</td>
</tr>
<tr>
<td>Deputy Engineer</td>
<td>Shri. Dattatray Tambare</td>
<td>Package-1</td>
</tr>
<tr>
<td>Deputy Engineer</td>
<td>Shri. Madhusudan Yenkar</td>
<td>Package-3</td>
</tr>
<tr>
<td>Deputy Engineer</td>
<td>Shri. Pravin Kavthekar</td>
<td>Package-4</td>
</tr>
<tr>
<td>Deputy Engineer</td>
<td>Shri. Nitin Khude</td>
<td>Package-5</td>
</tr>
<tr>
<td>Deputy Engineer</td>
<td>Shri. Vishram Dev</td>
<td>NRW</td>
</tr>
<tr>
<td>Deputy Engineer</td>
<td>Shri. Prashant Kadam</td>
<td>Tank Works</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Smt. Bhavana Jadkar</td>
<td>Package-1</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Shri. Arif Sheikh</td>
<td>Package-2</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Shri. Vijay Patil</td>
<td>Package-3</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Smt. Vaishali Jadhav</td>
<td>Package-3</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Shri. Farooq Sheikh</td>
<td>Package-4</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Smt. Rohini Chougule</td>
<td>Package-4</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Smt. Shivani Yadav</td>
<td>Package-5</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Shri. Satish Shinde</td>
<td>Package-6</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Smt. Manisha Pisal</td>
<td>Package-7</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Shri. Dipak Sonawane</td>
<td>NRW</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Shri. Ashok Sangade</td>
<td>Sus, Mhalunge Project</td>
</tr>
<tr>
<td>Sub. / Junior Engineer</td>
<td>Smt. Ashwini Waghmare</td>
<td>NRW, Newly Included Villages</td>
</tr>
</tbody>
<!-- Sub. / Junior Engineers --><!-- Deputy Engineers --><!-- Executive Engineers --><!-- Chief Engineer -->
</table>
</div>