Department
Order
0
Display format
Tiles
Gallery
Image
Other Details
Introduction: Reconstruction of Sadhu Vaswani Railway Overpass
The Pune Municipal Corporation has initiated the demolition and reconstruction of the Sadhu Vaswani Railway Overpass near Koregaon Park. This project aims to resolve traffic congestion and provide a modern, four-lane flyover for seamless connectivity between Bund Garden, Camp, Solapur Road, and surrounding areas.
Project Overview
- Location: Koregaon Park, Pune.
- Contractor: M/s S.M.C. Infrastructure Pvt. Ltd., Thane.
- Project Duration: 24 months (excluding monsoon period).
- Estimated Cost: ₹56.18 crore (4.90% above the tendered amount).
- Budget Allocation for FY 2023-24: ₹20.00 crore.
- Total Project Cost: ₹83.00 crore.
Project Benefits
- Improved Connectivity:
- The new overpass will facilitate smooth travel for all types of vehicles with a modern four-lane structure
- Enhanced access to Camp, Solapur Road, Yerwada, Koregaon Park, and nearby areas.
- Reduced Traffic Congestion:
- The overpass will alleviate congestion in surrounding areas and reduce travel time.
- Future-Ready Design:
- The overpass is designed to accommodate increasing traffic demands and support city development.
Technical Details
- Total Length of the Bridge: 640 meters.
- Width of the Bridge: 17.15 meters.
- Approach Road Lengths:
- Camp Side: 92 meters.
- Bund Garden Side: 164 meters.
- Width of Approach Roads: 17.15 meters.
Impact on Citizens
- Efficient Travel: The four-lane overpass will streamline movement, benefiting daily commuters and reducing delays.
- Urban Development Boost: Upgraded infrastructure will promote economic activity and ease logistical operations in surrounding areas.
Updates and Feedback
Stay updated with regular project progress on this page. Your feedback is important to us.
Project Status
Ongoing