Kalyani Nagar Bridge Expansion Project

Kalyani Nagar Bridge Expansion Project
Order
0
Display format
Tiles
Other Details

Introduction: Widening of Koregaon Park to Kalyani Nagar Bridge

The Pune Municipal Corporation has undertaken an important project to widen the Aga Khan Bridge (near Bhairoba Pumping Station) connecting Koregaon Park to Kalyani Nagar. This initiative aims to reduce traffic congestion and provide a safer and more convenient route for pedestrians and vehicles.

Project Overview

  • Location: Koregaon Park to Kalyani Nagar.
  • Contractor: M/s N.P. Infra Pvt. Ltd.
  • Project Duration: 24 months (including monsoon period) – Expected completion by September 2025.
  • Approved Cost: ₹24.07 crore (13.05% lower than the estimated cost).
  • Total Project Cost: ₹27.00 crore.

Project Benefits

  1. Reduced Traffic Congestion:
    The widening of the bridge will streamline traffic at the junction, ensuring smoother travel.
  2. Savings in Time and Fuel:
    Reduced delays in traffic will save time and fuel for commuters.
  3. Enhanced Pedestrian Safety:
    The upgraded infrastructure will provide a safer and more convenient passage for pedestrians.

Technical Details

  • Total Length of the Bridge: 415 meters.
  • RCC Structure Length: 415 meters.
  • Existing Bridge Width: 20.50 meters.
  • New Additional Width: 11 meters.

Impact on Citizens

  • Streamlined Traffic: The widened bridge will significantly reduce traffic congestion at the junction.
  • Improved Pedestrian Pathways: Pedestrians will have a safer and more accessible route for crossing the roads.
  • Boost to Urban Development: Enhanced infrastructure will promote local and city-wide economic growth.

Updates and Feedback

Stay updated with the progress of this project on this page. We value your feedback and suggestions.

Banner image
Kalyani Nagar Bridge Expansion Project
Project Status
Ongoing