Introduction: Ghorpadi Railway Overpass Construction Project

The Pune Municipal Corporation has initiated the construction of a railway overpass at Ghorpadi Gate No. 586 on the Pune-Miraj railway line. The primary objective of this project is to alleviate traffic congestion, provide a safe crossing for pedestrians, and save time and fuel for commuters.

Project Overview

  • Contractor: M/s S.M.C. Infrastructure Pvt. Ltd., Thane.
  • Consultant: M/s Creation Engineering Pvt. Ltd., Pune.
  • Project Cost: ₹109,15,92,474/- (Including GST, testing charges, and royalty charges) - Construction of a Railway Overpass (ROB-I, Gate No. 586) on the Pune–Miraj Line at Ghorpadi and Construction of a Flyover / Grade Separator at Mukundrao Ambedkar Chowk (Vishrantwadi Junction). Combined total cost.
  • Duration: 24 months (including the monsoon period).

Project Benefits

  1. Reduced Traffic Congestion:
    The closure of the railway gate will ensure smoother vehicular movement and eliminate congestion.
  2. Safe Pedestrian Crossing:
    Pedestrians will have a secure way to cross the railway line, reducing the risk of accidents.
  3. Time and Fuel Savings:
    With streamlined traffic, commuters will save valuable time and fuel.
  4. Boost to Urban Development:
    Modern infrastructure will contribute to the overall development of the Ghorpadi area.

Technical Details

  • Bridge Length: 636 meters (including solid approaches).
  • Bridge Width: 12 meters.

Significance for Citizens

This project not only resolves transportation challenges but also enhances safety for pedestrians and improves the quality of life in the Ghorpadi area. With efficient infrastructure, the area will witness improved connectivity and urban growth.

Project Status
Ongoing