Flyover and Grade Separator Project at Vishrantwadi Junction

Flyover and Grade Separator Project at Vishrantwadi Junction
Order
0
Display format
Tiles
Other Details

Introduction: Enhancing Connectivity at Mukundrao Ambedkar Chowk

The Pune Municipal Corporation is undertaking the construction of a flyover and grade separator at Mukundrao Ambedkar Chowk (Vishrantwadi Junction). This project aims to reduce traffic congestion and provide smoother connectivity for vehicles and pedestrians, significantly benefiting the residents and commuters in the area.

Project Overview

  • Location: Mukundrao Ambedkar Chowk (Vishrantwadi Junction).
  • Contractor: M/s S.M.C. Infrastructures Pvt. Ltd.
  • Contractor's work order number: Order No. 4660, dated 08/03/2024.
  • Consultant: M/s Creation Engineering Pvt. Ltd., Pune.
  • Project Cost: 109,15,92,474/- (Including GST, Royalty, Testing Charges, Labour Cess & Insurance) Construction of Rail Over Bridge on Pune-Miraj Railway Line at Ghorpadi (ROB-I, Gate No. 586) and Construction of Flyover/Grade Separator in Mukundrao Ambedkar Junction, Vishrantwadi (Combined Amount).
  • Duration: 24 months (including monsoon period) – Completion by March 2026.

Benefits of the Project

  1. Reduced Traffic Congestion:
    The flyover and grade separator will streamline traffic flow and reduce delays at Vishrantwadi Junction.
  2. Improved Airport Connectivity:
    The project will ease travel to and from Pune Airport, making the route more convenient for commuters.
  3. Support for IT and Commercial Areas:
    Enhanced connectivity to Kharadi IT Park and Nagar Road will benefit daily commuters and businesses.
  4. Future-Ready Infrastructure:
    The design integrates plans for the proposed Metro/Neo-Metro lines, ensuring compatibility with future urban transport systems.
  5. Pedestrian Safety:
    Existing pedestrian bridges will be repurposed to maintain safety and accessibility.

Technical Details

Flyover:

  • Total Length of flyover ( with Approach ): 630.12 R. m.
  • Length of RCC Structure: 291 R. m.
  • Width Of Flyover: 7 m.
  • Length of Approach Road (Solid Ramp) : Alandi Side – 197.12 m, Lohgaon Side - 142 m.
  • Width Of Approach Road : 7 m.

Grade Separator:

  • Total Length of Grade Separator: 595 R.m.
  • Length of RCC Structure: 595 R. m.
  • Width Of Grade Separator: 7 meters.
  • Length of Approach Road (Solid Ramp) : Alandi Side – 185 m. , Lohgaon Side – 150 m. , Yerwada Side – 140 m.

Approach Roads:

  • Alandi Side: 197 meters (flyover), 185 meters (grade separator).
  • Lohegaon Side: 142 meters (flyover), 150 meters (grade separator).
  • Yerwada Side: 140 meters (grade separator)

Impact for Citizens

  • Smooth Commute: Reduces travel time and minimizes traffic congestion.
  • Cost and Time Savings: Saves fuel and reduces delays for daily commuters.

Urban Development: Enhances connectivity and facilitates future growth in the area.

Banner image
Flyover and Grade Separator Project at Vishrantwadi Junction
Project Status
Ongoing